Client: CAET XXI (Construction Consortium for the Transmontana PPP) / Senerpor, S.A.
Location: TransmontanaHhighway (PPP) A4/IP4 – Vila Real (Parada de Cunhos) / Quintanilha
Design date: 2009 - 2010
Construction date: 2011 - 2012
Services: Preliminary Study; Detailed Design; Technical Assistance to the Construction
Construction: FCC – Construction, S.A. (Portugal) / Soares da Costa, S.A. / Novopca, S.A.
Summary: Prestressed Concrete Box Girder Bridge. Construction by the Balanced Cantilever Method.
Total length / Span / Height / Width:
290.5 m / 110 m / 27 m / 12.8 m
TUA RIVER BRIDGE
Contacts
NSE • Consultores de Engenharia, Lda
Avenida da República, n.º 41, 1º Dto., 1050-187 Lisboa
Telephone: +351 217 942 533
Fax: +351 217 942 535
E-mail: geral@nse.pt
NSE · Consultores de Engenharia Lda. 2017 ©