Client: REFER, E.P.E. (Portuguese Rail Network)
Location: Modernization of the North Railway Line - Segment 1.4: Azambuja – Vale de Santarém
Design date: 2004 - 2004
Construction date: 2005 - 2006
Design by: Daniel Sousa (developed at Viaponte, S.A.)
Services: Preliminary Study, Execution Project, Technical Assistance to the Construction
Construction: Mota-Engil, S.A.
Summary: 1300 m long railway viaduct of prestressed reinforced concrete, with a 30 m long standard span, built with movable scaffolding system. The viaduct crosses an alluvial edge along the Tagus river and it is founded 50 m deep in a high seismic risk zone, forcing the adoption of a complex damping system for horizontal actions.
Total length / Span / Height / Width:
1312m / 30m / 12m / 12,3m
Construction cost: 11 500 000,00 €
SANTANA DO CARTAXO VIADUCT
Contacts
NSE • Consultores de Engenharia, Lda
Avenida da República, n.º 41, 1º Dto., 1050-187 Lisboa
Telephone: +351 217 942 533
Fax: +351 217 942 535
E-mail: geral@nse.pt
NSE · Consultores de Engenharia Lda. 2017 ©