SABOR RIVER BRIDGE

Transmontana Highway (PPP) - A4/IP4 – Vila Real (Parada de Cunhos) / Quintanilha

Client: CAET XXI (Construction Consortium for the Transmontana PPP) / Senerpor, S.A.

Location: Transmontana Highway (PPP) - A4/IP4 – Vila Real (Parada de Cunhos) / Quintanilha

Design date: 2009 - 2010

Construction date: 2011 - 2012

Services: Preliminary Study; Detailed Design; Technical Assistance to the Construction

Construction: FCC – Construction, S.A. (Portugal) / Soares da Costa, S.A. / Novopca, S.A.


Summary: Dual deck with haunched prestressed concrete box girders. Construction by the Balanced Cantilever Method.

Length / Span / Height / Width

532.5 m / 130 m / 86 m / 12.8 m