RIBEIRADIO/ERMIDA HYDROELECTRIC DEVELOPMENT PRIP – LANDSCAPE RECOVERY PLAN

RIBEIRADIO – ERMIDA HYDROELECTRIC DEVELOPMENT

Client: Greenvouga (Joint venture owned by EDP - Gestão da Produção de Energia e MARTIFER RENEWABLES)

Location: Ribeiradio – Ermida Hydroelectric Development

Design date: 2014 - 2015

Construction date: 2015 - 2016 

Services: Final Design

Construction: Ribeiradio-Ermida, ACE (FCC Construcción, S.A. / OPWAY, S.A. / RRC, S.A. Consortium)


Summary: Landscape architecture for the associated buildings and infrastructures of both Ribeiradio and Ermida Dams and Landscape Recovery Plans for Ribeiradio and Ermida Levels that correspond to the development and detailing of the environmental impact mitigation measures prescribed in the project’s Environmental Impact Statement necessary to the recovery and repair of areas affected by the construction works of the new hydroelectric plants in Vouga River.

RIBEIRADIO/ERMIDA HYDROELECTRIC DEVELOPMENT PRIP – LANDSCAPE RECOVERY PLAN

Contacts

NSE • Consultores de Engenharia, Lda

Avenida da República, n.º 41, 1º Dto., 1050-187 Lisboa

Telephone: +351 217 942 533

Fax: +351 217 942 535

E-mail: geral@nse.pt

NSE · Consultores de Engenharia Lda. 2017 ©