Client: CAET XXI (Construction Consortium for the Transmontana PPP) / Senerpor, S.A.
Location: Transmontana Highway (PPP) - A4/IP4 – Vila Real (Parada de Cunhos) / Quintanilha
Design date: 2009 - 2010
Construction date: 2011 - 2012
Services: Preliminary Study; Detailed Design; Technical Assistance to the Construction
Construction: FCC – Construcción, S.A. (Portugal) / Soares da Costa, S.A.
Summary: Dual deck with haunched prestressed concrete box girders. Construction by the Balanced Cantilever Method.
Length / Span / Height / Width
365 m / 110 m / 56 m / 2x12.8 m
RIBEIRA DE JORJAIS BRIDGE
Contacts
NSE • Consultores de Engenharia, Lda
Avenida da República, n.º 41, 1º Dto., 1050-187 Lisboa
Telephone: +351 217 942 533
Fax: +351 217 942 535
E-mail: geral@nse.pt
NSE · Consultores de Engenharia Lda. 2017 ©