Client: Gobierno de la República de Panamá (Government of the Republic of Panama) / Odebrecht Infraestructura
Location: Carretera Panamericana (Interamerican Highway) – Panamá
Design date: 2014 - 2015
Construction date: 2015 - 2016
Services: Base Design; Detailed Design; Technical assistance to the Construction
Construction: CNO - Constructora Norberto Odebrecht de Panamá
Summary: 3 span bridge with a total length of 130.1m and maximum span of 61.6m constructed by the incremental launching method.
The deck is a mixed solution of 2 steel girders and a precast reinforced concrete slab.
The abutments and piers are supported using indirect foundations.
NEW BRIDGE OVER SAN PABLO RIVER
Contacts
NSE • Consultores de Engenharia, Lda
Avenida da República, n.º 41, 1º Dto., 1050-187 Lisboa
Telephone: +351 217 942 533
Fax: +351 217 942 535
E-mail: geral@nse.pt
NSE · Consultores de Engenharia Lda. 2017 ©