Client: Islamic Republic of Mauritania / Norvia, S.A.
Location: Islamic Republic of Mauritania
Design date: 2007 - 2008
Construction date: 2008 - 2009
Services: Detailed Design; Technical assistance during construction.
Construction: Construtora do Tâmega, SA / AFA – Avelino Farinha & Agrela
Summary: 16 bridges with a 16.8 m long standard span built with precast reinforced concrete beams in an area with shortage of water and without conditions for concrete transportation. 223 reinforced concrete multi-cell culverts (1 to 24 cells), with both precast and cast on site components.