GLOBAL PROJECT OF THE LINE 2 AND AV. FAUCETT – AV GAMBETTA

PRIMARY SUBWAY NETWORK OF LIMA AND CALLAO - PERU

Client: Consortium Metro de Lima Línea 2; CJC – Engenharia e Projetos Ltda.

Location: Primary Subway Network of Lima and Callao - Peru

Design date: 2013 - 2014

Services: Tender Project for 35 metro stations - Design of internal structures, auxiliary structures and earth retaining structures


Summary: Structures basic design for 35 new metro stations, divided into 9 types. 27 passenger stations will be on line 2 (length 27 km) and 8 stations will be built on the branch Av Faucett - Av Gambetta (7.6 km long)

Constructive methods considered in the study included Vertical NATM excavation (vertical tangent shafts) and Cut-and-cover. The design and modelling were developed based on detailed seismic studies of soil-structure interaction using seismograms of large earthquakes in Chile and Peru.

GLOBAL PROJECT OF THE LINE 2 AND AV. FAUCETT - AV GAMBETTA

Contacts

NSE • Consultores de Engenharia, Lda

Avenida da República, n.º 41, 1º Dto., 1050-187 Lisboa

Telephone: +351 217 942 533

Fax: +351 217 942 535

E-mail: geral@nse.pt

NSE · Consultores de Engenharia Lda. 2017 ©