Client: Hidroeléctrica da Ribeira de Alforfa, SA
Location: Alforfa River – Covilhã – Portugal
Design date: 2005 - 2005
Construction date: 2005 - 2005
Design by: José António Amaral (developed at Tecnasol, FGE)
Services: Detailed Design; Technical Assistance to the Construction
Construction: TECNASOL, FGE
Summary: Dam wall and foundation rehabilitation.
Upgrading of all hydraulic components.
Drainage basin area: 1.92 km²
Average annual precipitation – 2 500 mm
Average total flow (annual) – 2 900 × 1 000 m³
COVÃO DE FERRO DAM
Contacts
NSE • Consultores de Engenharia, Lda
Avenida da República, n.º 41, 1º Dto., 1050-187 Lisboa
Telephone: +351 217 942 533
Fax: +351 217 942 535
E-mail: geral@nse.pt
NSE · Consultores de Engenharia Lda. 2017 ©