Client: Madeira Regional Government / NORVIA, S.A.
Location: Autonomous region of Madeira
Design date: 2007 - 2008
Construction date: 2011 - 2012
Services: Preliminary Study; Detailed Design; Technical Assistance to the Construction
Construction: Somague, S.A. / Mota-Engil, S.A.
Summary: 5 viaducts with particularly complex geometries and construction conditions with spans up to 63m.
Constructive method:
Falsework from the ground – Viaducts V1, V2A and V2 B
Balanced cantilever method – Viaducts V3 and V4.
back
Contacts
NSE • Consultores de Engenharia, Lda
Avenida da República, n.º 41, 1º Dto., 1050-187 Lisboa
Telephone: +351 217 942 533
Fax: +351 217 942 535
E-mail: geral@nse.pt
NSE · Consultores de Engenharia Lda. 2017 ©