TUA RIVER BRIDGE

TransmontanaHhighway (PPP) A4/IP4 – Vila Real (Parada de Cunhos) / Quintanilha

Client
CAET XXI (Construction Consortium for the Transmontana PPP) / Senerpor, S.A.
Location
TransmontanaHhighway (PPP) A4/IP4 – Vila Real (Parada de Cunhos) / Quintanilha
Design date
2009 - 2010
Construction date
2011 - 2012
Services
Preliminary Study; Detailed Design; Technical Assistance to the Construction
Construction
FCC – Construction, S.A. (Portugal) / Soares da Costa, S.A. / Novopca, S.A.
Summary

Prestressed Concrete Box Girder Bridge. Construction by the Balanced Cantilever Method.

Total length / Span / Height / Width:

290.5 m / 110 m / 27 m / 12.8 m

TUA RIVER BRIDGE

Project detail