RIBEIRA DA AÇOREIRA BRIDGE

Transmontana Highway (PPP) - A4/IP4 – Vila Real (Parade de Cunhos) / Quintanilha

Client
CAET XXI (Construction Consortium for the Transmontana PPP) / Senerpor, S.A.
Location
Transmontana Highway (PPP) - A4/IP4 – Vila Real (Parade de Cunhos) / Quintanilha
Design date
2009 - 2010
Construction date
2011 - 2011
Services
Preliminary Study; Detailed Design; Technical Assistance to the Construction
Construction
FCC – Construcción, S.A. (Portugal) / Soares da Costa, S.A.
Summary

Deck with precast concrete girders solidarized with cast-in-place transverse beams and infill concrete slab.

Length / Span / Height / Width :

192 m / 35 m / 55 m / 12.8 m