Back

Bridges and Viaducts

BRIDGE OVER THE AZIBO RIVER

Transmontana Highway (PPP) - A4/IP4 – Vila Real (Parade de Cunhos) / Quintanilha

Client
CAET XXI (Construction Consortium for the Transmontana PPP) / Senerpor, S.A.
Location
Transmontana Highway (PPP) - A4/IP4 – Vila Real (Parade de Cunhos) / Quintanilha
Design date
2009 - 2010
Construction date
2011 - 2012
Services
Preliminary Study; Detailed Design; Technical Assistance to the Construction
Construction
FCC – Construcción, S.A. (Portugal) / Soares da Costa, S.A.
Summary

Dual deck with precast concrete girders solidarized with cast-in-place transverse beams and infill concrete slab.

Length / Span / Height / Width:

270 m / 42 m / 33 m / 12,8 m

BRIDGE OVER THE AZIBO RIVER

Project detail

Back