Back

Bridges and Viaducts

New Bridge Over The River Corvo (North)

Pinhal Interior PPP – Lot 3 /A13/IC3 – Condeixa/Coimbra

Client
Ascendi / Pinhal – Construtoras Das Estradas Do Pinhal Interior, A.C.E.
Location
Pinhal Interior PPP – Lot 3 /A13/IC3 – Condeixa/Coimbra
Design date
2011
Construction date
2011 - 2013
Services
Preliminary Study (2010), Detailed Design (2010), Technical Assistance to the Construction (2011-2013)
Construction
Mota-Engil, S.A.
Summary

Double girder dual deck bridge in prestressed concrete. Construction by Movable Scaffolding.

Length / Span / Height / Width:

378 m / 52 m / 90 m / 2x13.3 m

New Bridge Over The River Corvo (North)

Project detail

Back