Back

Bridges and Viaducts

Kaédi / M’Bout / Selibaby / Gouraye Road (305 km)

Islamic Republic of Mauritania

Client
Islamic Republic of Mauritania / Norvia, S.A.
Location
Islamic Republic of Mauritania
Design date
2007 - 2008
Construction date
2008 - 2009
Services
Detailed Design; Technical assistance during construction.
Construction
Construtora do Tâmega, SA / AFA – Avelino Farinha & Agrela
Summary

16 bridges with a 16.8 m long standard span built with precast reinforced concrete beams in an area with shortage of water and without conditions for concrete transportation. 223 reinforced concrete multi-cell culverts (1 to 24 cells), with both precast and cast on site components.

Kaédi / M’Bout / Selibaby / Gouraye Road (305 km)

Project detail

Back