Back

Intermodal, Rail and Metro Stations

LIMA METRO - TENDER PROJECT LINE 2 AND AV. FAUCETT - AV GAMBETTA • LIMA - PERU

Primary Subway Network of Lima and Callao - GLOBAL PROJECT OF THE LINE 2 AND AV. FAUCETT - AV GAMBETTA EXTENSION

Client
Consortium Metro de Lima Línea 2; CJC – Engenharia e Projetos Ltda.
Location
Primary Subway Network of Lima and Callao - GLOBAL PROJECT OF THE LINE 2 AND AV. FAUCETT - AV GAMBETTA EXTENSION
Design date
2013 - 2014
Services
Tender Project for 35 metro stations - Design of internal structures, auxiliary structures and earth retaining structures
Summary

Structures basic design for 35 new metro stations, divided into 9 types. 27 passenger stations will be on line 2 (length 27 km) and 8 stations will be built on the branch Av Faucett - Av Gambetta (7.6 km long)

Constructive methods considered in the study included Vertical NATM excavation (vertical tangent shafts) and Cut-and-cover. The design and modelling were developed based on detailed seismic studies of soil-structure interaction using seismograms of large earthquakes in Chile and Peru.

LIMA METRO - TENDER PROJECT LINE 2 AND AV. FAUCETT - AV GAMBETTA • LIMA - PERU

Project detail

Back