Back

Hydraulics

COVÃO DE FERRO DAM

Alforfa River – Covilhã – Portugal

Client
Hidroeléctrica da Ribeira de Alforfa, SA
Location
Alforfa River – Covilhã – Portugal
Design date
2005 - 2005
Construction date
2005 - 2005
Design by
José António Amaral (developed at Tecnasol, FGE)
Services
Detailed Design; Technical Assistance to the Construction
Construction
TECNASOL, FGE
Summary

Dam wall and foundation rehabilitation.

Upgrading of all hydraulic components.

Drainage basin area: 1.92 km²

Average annual precipitation – 2 500 mm

Average total flow (annual) – 2 900 × 1 000 m³

COVÃO DE FERRO DAM

Project detail

Back