Back

Bridges and Viaducts

Câmara de Lobos Highway / Strait of Câmara de Lobos

Autonomous region of Madeira

Client
Madeira Regional Government / NORVIA, S.A.
Location
Autonomous region of Madeira
Design date
2007 - 2008
Construction date
2011 - 2012
Services
Preliminary Study; Detailed Design; Technical Assistance to the Construction
Construction
Somague, S.A. / Mota-Engil, S.A.
Summary

5 viaducts with particularly complex geometries and construction conditions with spans up to 63m.

Constructive method:

Falsework from the ground – Viaducts V1, V2A and V2 B

Balanced cantilever method – Viaducts V3 and V4.

Câmara de Lobos Highway / Strait of Câmara de Lobos

Project detail

Back