Natural gas liquefied project in Angola, province of Soyo.
524 m long bridge over channel with a standard span of 25 m. Entirely precast structure - rammed piles, cross girders and deck - on the Base Solution. The Alternative Solution was designed using cast in place piles.
The project consisted of a 7.15 km long road in a geotechnical complex marshland near the banks of the mouth of Zaire River (Soyo).